The official demolished the existing footpath and mixed up with the existing gutter. There is no gutter or footpath at present. In front side of the Chembur Railway station, the contractor left the work which the reason unknown. It is very difficult for a pedestrian to pass through this road due to heavy traffic and congestion of road. The video footage of the footpath is uploading for the ready reference.
You are here: Home / Karwao / Mumbai Information / Locality News / OFFICIAL APATHY AND DELAYED WORK OF FOOTPATH AT CHEMBUR