For 24×7 supply, water reforms in BMC’s pipeline Rs 356 crore earmarked to repair/replace pipes over 2 yrs; plugged leakages will save 160 MLD SAYLI UDAS B ETTER quality, lesser wastage and 24-hour supply-aims set, the BMC has By next month, speciallyappointed agencies will be working the plan. “About 20-23 per cent of the water-160 MLD-we draw for Mumbai is wasted in Secondly, Rs 356 crore will be spent over the next two years to minimise the “This has to be taken up immediately, since it will minimise the problem of The BMC is also keen to spend less on pumping water-presently, around 30 MW URL : |